Identity Area
- Title
- File 9 – 3/4th Year Quantity Surveying
- Extent and Medium
- 1 lever arch folder
Content and Structure
Scope and Content
Worked Examples (format is Drawing No; Drawing Title; Model (all references in brackets are to the Standard Method of Measurement of Building Works Edition 5 (SMM) Sections)
43 Boundary Wall (D,F,G,
44 Banda Drawing Lead Flat Roofing, Zinc Roofing, Copper covered flat roof, Copper covered flat roof with standing seems (M).
45 Lead flat Roof with Sloping upstand (M)
46 Lead Flat Roof with Box Gutter (M)
47 Copper Hipped Roof (M)
48 Parapet Gutter in Lead (M)
49 a and b Plumbing (S)
50 Stone Dressings (K)
51 Window Openings (G,F,K)
52 Stone Work (K)
No number Hot Water Installation (S)
1 Basement Excavations / Underpinning (D,H,G) (Civils)
2 Retaining Wall (D,F,J,G,K) (Civils)
3 Chimney Shaft (D,G,F,
4 Precast Concrete Piling / Concrete Building RICS Final Exam 1963 (E,F
5 Entrance Door (F)
6 Concrete Balcony (F)
7 Loading Bay (F)
8 Concrete Stair (F)
9 Reinforced Concrete Building (F)
10 Structural Steel Work Sheet 1 (Q)
11 Structural Steel Work Sheet 2 (Q)
12 Structural Steel Work (Q)
Conditions of Access and Use
- Conditions Governing Access
- No restrictions
Access Points
- Subjects
Administrative Area
Related Items
- [Series] Worked Example Files
- [File] File 4 - Second Year Quantity Surveying
- [File] File 5 - Second Year Quantity Surveying
- [File] File 6 – 2/3rd Year Quantity Surveying
- [File] File 8 – 3rd Year Quantity Surveying
- [File] File 9 – 3/4th Year Quantity Surveying
- [File] File 10 – 4th Year Quantity Surveying
- [File] File 12 – 4th Year Quantity Surveying + Text Books and Exam Papers
- [File] File 4 - Second Year Quantity Surveying